Beverly7520 Beverly7520
  • 01-03-2018
  • Social Studies
contestada

In the lean principles philosophy, unexpected downtime is the result of unreliable processes.

a. True

b. False

Respuesta :

Grace0424
Grace0424 Grace0424
  • 01-03-2018
I thinks the answer is true
Answer Link

Otras preguntas

Why does William Faulkner present the events in scrambled order (out of their actual chronological order)
The information from messenger RNA is used to create polypeptide sequences during the process of _____.​
What is the mole fraction of O2O2 in a mixture of 15.1 gg of O2O2, 8.19 gg of N2N2, and 2.46 gg of H2H2
The addition of 9.0×105 J is required to convert a block of ice at -10 ∘C to water at 11 ∘C. i need help this is due in less than 15 minutes​
Please help me. I’ve been working on this for 5 hours and 31 minutes.
Which of the following is not a risk associated with international contracting? a. Currency exchange rates b. Transportation costs c. Fee collection d. None of
How did the New Deal change the relationship between business and labor?​
Please show work cause I’m confused
United States residents are how many times more likely to die from breast cancer than residents of Hungary?
a right circular cylinder has a height of 5 1/2 ft and a diameter of 2 3/4 times its height. What is the volume of the cylinder? Use 3.14 for pi