ridume2020 ridume2020
  • 02-01-2024
  • Mathematics
contestada

Montu finishes a piece of work in 24 days. How much work will he complete in 8 days?​

Respuesta :

ahmedmaham984
ahmedmaham984 ahmedmaham984
  • 02-01-2024

Answer:

Therefore, he will complete 1/3 of the work in 8 days as 24 ÷ 8 = 3.

Answer Link

Otras preguntas

Which therapeutic cloning application is most likely a benefit to society
What is 0.125 rounded to the nearest hundredth
what role did the freedmen's bureau play in reconstruction?
A group of students observed the following tree while hiking a hilly area. What is the most likely cause for the angel of growth of this tree?
A rocket carrying fireworks is launched from a hill 80 feet above a lake. The rocket will fall into the lake after exploding at its maximum height. The rocket's
Solve the equation 8x-12=5+15
the process by which we develop our political values and opinions throughout our lives
what amendment gives us protection against the national government's doings things not listed in the constitution
how to change 4.1 into a decimal?
Which sentence uses all its subject pronouns correctly? A. You, Travis, and him play with good sportsmanship. B. Barbara and I went hiking in the woods. C. Him