The first bricklayer can build a wall in 15 days, and the second bricklayer can build the same wall in 10 days How long will it take for them to build the wall together?

Respuesta :

kristyhavard198
kristyhavard198 kristyhavard198
  • 02-05-2022

Answer:

It will take both of the brick layers twelve and half days

Answer Link
dxphnis dxphnis
  • 08-05-2022

6 Days

Step-by-step explanation:

First you must find the combined rate of work per day between the two bricklayers.

(100/10)+(100/15) = 16 2/3

For each day the two bricklayers complete 16 2/3 percent of the work. To find out the amount of days it take them to build the wall you divide 16 2/3 from 100

100/16 2/3 = 6

The amount of days it take the two bricklayers to build the wall together is 6.

Answer Link

Otras preguntas

What is a direct combination reaction?
Nadine can send or receive a text message for 15 cents or get an unlimited number for 5 dollars. Write and solve an inequality to find how many messages she can
When was World War I?
in an expression(8/9) squared (-81)+3/5dividedby-9/10
Rewrite the function c(x) =9(x+3) using the distributive property
When was William Shakespeare born
Nadine can send or receive a text message for 15 cents or get an unlimited number for 5 dollars. Write and solve an inequality to find how many messages she can
You have a cylinder with a diameter of 15 inches and a height of 12 inches. What is the volume of the largest sphere thg will fit inside it? If you can will you
Was the Gold Rush a good or bad thing for the United States?
.is a pot holder a conductor or a insulator