kelvinkibalama kelvinkibalama
  • 02-03-2022
  • Business
contestada

what is changing risk​

Respuesta :

pompomsquad33 pompomsquad33
  • 02-03-2022

Answer:

here:

Explanation:

A change risk is the probability that a change program will not reach its stated objectives and goals. There is a wide range of factors that will increase the change risk for a project, and so it is important to conduct an effective risk change assessment to understand, document, and reduce these change risks.

Answer Link

Otras preguntas

Which region of the thirteen colonies is represent in cluster A
acronyms and creative sentences to remember different concepts With what part of the brain does it likely think?
How do you call a representation of the interlocking food chains that connect all organisms in an ecosystem?
Which tier of the Indian caste system was made up of poor farmers and menial laborers and was reserved for non-Aryan people? A: Kshatriyas B: Brahmans C: Sudr
Explain the difference between the preterite and the imperfect.
What two colors make pink?
what would happen to the human body if one of the organ systems stopped working
The graph of the function y = x2 + 2 is shown. Which equation will shift the graph of the function down 4 units?
How can I compare these scores?
PLEASE HELP I WILL GIVE 5 STAR A HEART AND IF TWO ANSWERS I WILL GIVE U A BRAINLEST A farmer has decided to divide his land area in half in order to plant soy