krishnashrrstha41
krishnashrrstha41 krishnashrrstha41
  • 04-08-2021
  • Mathematics
contestada

15men can complete a piece of work in25days. how many men should be added to complete the same work in15days.​

Respuesta :

mhanifa
mhanifa mhanifa
  • 04-08-2021

Answer:

  • 10 men

Step-by-step explanation:

Amount of work done by 15 men is:

  • 15 men *25 day = 15*25 man*days

Same work can be done by 25 men, in 15 days, so 10 more men should be added.

Answer Link
abovejosh
abovejosh abovejosh
  • 04-08-2021
Answer: 10 men explanation: guy above me
Answer Link

Otras preguntas

V(v-1)-2(1-v) how to solve this
the equation of line wx is y = -2x - 5. write an equation of a line perpendicular to line wx in slope-intercept form that contains point (-1, -2)
All are examples of cross-contamination except
Poem about how ones lifestyle can affect the circulatory and respiratory system
Who was the 21st president of the united states?
Combining two or more segments of the industry to deliver the best care, at the most cost-effective rate, in the best setting refers to a/an A. preferred p
Completely factor the polynomial. 4x^2 20x 25
The majority of poles are ___. a. roman catholic, b. jews, c. communists, d. muslims
Who create and developed castlevania?
If 1/2 the students go to the library and another 1/2 go to the computer lab. If 8 students are left in the class now how many students were in the class origin