razz25
razz25 razz25
  • 03-05-2021
  • Mathematics
contestada

ramesh can complete a piece of work in 10 days he worked for 4 days and left. if dinesh complete the remaining part of the work ,how much work was done by dinesh​

Respuesta :

rylaneckst rylaneckst
  • 05-05-2021

Answer:

100% of the work was done by him

Answer Link

Otras preguntas

How did the Taung Child die?
Lines and stanzas in a narrative poem are like: scenes and acts in a play chapters in a novel sentences and paragraphs in a short story all of the above
name 3 Y o u t u b e r s you like​
how do you think the people who settled near rivers and inland lakes made thier living.
7. Malware could A. cause a system to display annoying pop-up messages B. be utilized for identity theft by gathering personal information C. give an attacke
5. Write 8% as a decimal
The answer is A) The tilt of the earth on its axis
Blank are used in products of organic foods
-10.1=w+5.3 what would w equal
Sub to me my channel is bizarre Hayden thanks