victorharrell2003
victorharrell2003 victorharrell2003
  • 01-05-2021
  • Computers and Technology
contestada

PLEEASE ANWER QUICK: The project manager is writing the requirements document. Which phase of the project life cycle is he in?
project closure
project planning
project initiation
project execution ​

Respuesta :

Animmango
Animmango Animmango
  • 01-05-2021

Answer:

I think, project execution. He is writing the requirements document. which mean it doesn't project closure and initiation. then he did it which mean it doesn't project planning.

Answer Link

Otras preguntas

What are the two major political parties in the United States?
Equal amounts or ethanol and water are mixed at room temperature and at 101.3 kPa. Which process is used to separate ethanol from the mixture? (1) distillation
Which atom has the largest atomic radius? (1) potassium (3) francium (2) rubidium (4) cesium
What are two rights of everyone living in the United States?
What does the judicial branch do?
Find the value of 15.0 Newton in pounds
Who was President during World War I?
What is the approximate height of the average adult in centimeters?
Under our Constitution, some powers belong to the states. What is one power of the states?
The excitation of an electron on the surface of a photocell required 5.0 x 10 –27 J of energy. Calculate the wavelength of light that was needed to excite the e