azharkareem2340 azharkareem2340
  • 01-03-2021
  • Mathematics
contestada

It takes 2 workers 6 days to paint a mansion. How many days would it take 4
workers to do the same job?

Respuesta :

dontmindme3
dontmindme3 dontmindme3
  • 01-03-2021

Answer:

2 workers = 6 days

4 workers = 3 days

Step-by-step explanation:

If it takes 2 workers 6 days, if you seep up the process with 4 workers, you would divide the days by 2 because you multilpied the workers by 2. So, it would take 3 days with 4 workers. I hope that makes sence.

Answer Link

Otras preguntas

y=6/x lienear function
Solve the equation n/10 + 7 = 16
Which one is correct?
If an asset costs $16,000, has an expected useful life of 8 years, is expected to have a $2,000 salvage value and generates net annual cash inflows of $2,000 a
Kathy has $50 in her bank account right now. After three days she had $35 left. What is her rate of change per day? Think about if she is making or spending mon
(NEED HELP PLEASE) A physics student goes to the roof of the school, 24.15 m above the ground, and drops a pumpkin straight down with an initial velocity of 0 m
This sign for "school" is an example of an arbitrary sign because there is an obvious connection between the sign and its meaning there is no obvious connecti
Which of the following is NOT correct and why? Il est roux. Elle est rousse. Elle a les yeux verts et les cheveux rousse. Il a les yeux verts et les cheveux ro
can someone help . i know I'm dumb:) x-5=7​
The volume of a fish tank is given by the function V (x) = (x + 7) (1-4) (2x + 3). Write a function describing a fish tank that has the same height but is longe