medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

a woman at a point a on the shore of a circular lake with radius 1.2 mi wants to arrive at the point B diametrically opposite A on the other side of the lake in
If the point (7, 3) is on the graph of an equation, which statement must be true?​
The duty of a clerk is to check all incoming mail and to record it. The sentence above should be revised into A. It is the duty of a clerk is to record all inc
For which of the following reasons were the Federalist Papers written? a. To persuade delegates to keep the Articles of Confederation b. To persuade Americans t
Explain the concept separation of powers
Select the correct answer. Which word or phrase correctly completes this sentence? Les mémorisent les dialogues pour la pièce de théâtre. OA. ballerines OB. met
Explain the concept separation of powers
Directions: Find the inverse of each number. Additive -3 = 14 = -28 = -1/5 = Multiplicative 2/3 = 6/18 = 5 = 11 =
LAST ONE PLEASE ANSWER IT
Briefly explain the importance of doing backup in systems administration and explain in detail any three methods for performing backup!?​