toniaotieno
toniaotieno toniaotieno
  • 02-01-2021
  • Mathematics
contestada

how do you find the mean completion time of a PERT network diagram?​

Respuesta :

okekesarah01642112
okekesarah01642112 okekesarah01642112
  • 02-01-2021

Answer:

PERT is an estimating technique that uses a weighted average of three numbers (see below) to come up with a final estimate. The resulting PERT estimate is calculated as (O + 4M + P)/6. This is called a "weighted average" since the most likely estimate is weighted four times as much as the other two values.

Answer Link

Otras preguntas

How would you describe bias and how would you say that bias affects your life
Answer ALL if u cant see all the answers it don't matter all u need is the question
Why it is of advantage to use coal as a source of energy?
Absolute value of |-44|
Think of a novel or short story that you appreciated. Write an example of a poor thesis statement for that text and explain why it is a poor example.
Simplify the rational expression state any excluded values
Factor 12G+4G+4 and 40-10h+9-4h
The first card selected from a standard 52-card deck was a king. if it is not returned to the deck, what is the probability that a king will be drawn on the sec
Lori rented a car for one day. The daily rental rate was $12.50 plus 25 cents per mile. The total cost of her rental was $46. How many miles did she drive that
One card is selected at random from an ordinary deck of 52 playing cards. let a = event a face card is selected