neivialfaro neivialfaro
  • 01-09-2020
  • Computers and Technology
contestada

You work for a company that is losing sales because it takes days to manufacture products. What technology can you suggest the company use to speed production?

Respuesta :

fatboipear
fatboipear fatboipear
  • 01-09-2020

Answer:

i guess artificial intelligence or robots

Answer Link

Otras preguntas

A private airplane leaves an airport and flies due east at 192 km/hr. Two hours later, a jet leaves the same airport and flies due east at 960 km/hr. How long a
_____ is support that relies on the credibility of the author. a. ethos b. pathos c. none of the choices d. manipulation
The area of the surface of the swimming pool is 210 square feet. what is the lenght d of the deep end (in feet)?
What is an estimate of the equation 6n+3=2? Use a table
a good persuasive argument has at least _____ piece of evidence.
If your clothing catches fire, you should. a. stop, drop, and roll. b. run outside. c. stay low and run to escape flames.
Choose the missing step in the given solution to the inequality −x − 3 < 13 + 3x. −x − 3 < 13 + 3x _______________ −4x < 16 x > −4 −4x − 3 > 13
Jesse owns a sporting goods store that sells skis and snowboards. The store earns a profit of $52 for each ski sold and a profit of $64 for each snowboard sold.
what is the formula for the nth term of a geometric sequence with a4 = 16 and r =1/2 ?
one third of a number increased by 12 one thirdn + 12 n plus 12 over 3 one third(n + 12) n + one third(12)