joco7335 joco7335
  • 03-07-2020
  • Mathematics
contestada

A builder was paid £550 for the work he did. He spent 35% of the money on materials how much did the materials cost

Respuesta :

gilbertazavedo72
gilbertazavedo72 gilbertazavedo72
  • 03-07-2020

Answer: £192.50

Step-by-step explanation:

550 x 0.35 = 192.50

Answer Link

Otras preguntas

Will someone please explain how to do -(7c-18)-2>0 Step for step??? I don't understand how to.
Where does all of the energy in an ecosystem ultimately come from? Please help
germany has a land area of 134,835 square miles and a water area of 3,011square miles .what is the total area of Germany
PLEASE HELP MEthank you, and 15 points!!Gretchen and Ezia received equal scores on a test made up of multiple choice questions and an essay. Gretchen got 18 mul
3/5x=52 is the answer 120 or 130
what is the value of the tape diagram if the ratio is 8 to 7 and the total is 195
How do you work out 8 something 2 something 1 =24 ?
what is an integral part of blood, which carries nutrients to all parts of the body
factor strings of 840 up to six factors
1 inch of rain per year or less in grassland? Is this a lot or a little of rain?