jyhearussel19 jyhearussel19
  • 02-05-2020
  • Physics
contestada

A machine has an efficiency of 70%. How much work dose the machine do when 20,000 J of work is done on it

Respuesta :

andrezazueta239 andrezazueta239
  • 10-11-2020

Answer:

a

Explanation:

Answer Link
md0454 md0454
  • 13-01-2021

Answer:

A. 14,000 J

Explanation:

on edg.

Answer Link

Otras preguntas

The number of waves that pass a particular point in a unit of time is called the __________ of the waves. (a) rarefaction (b) compression (c) amplitude (d) freq
Where do the cranial nerves originate? Where do the spinal nerves originate?
solve 2/3 + 1/4x = 1/3
what time is 9 hours and 30 minutes before. 4:25
The dimensions of a brick that weighs 25 N are 0.19 m × 0.07 m × 0.095 m. What pressure does the brick exert on the ground if it is resting on its largest face?
The base of right prism is rhombus of diagonal is 6 and 8cm and altitude is 12 cm find total surface area
If 2 less than or equal too X less than or equal too 6, which of the following has the greatest value
The base of right prism is rhombus of diagonal is 6 and 8cm and altitude is 12 cm find total surface area
A history quiz consists of five true-false questions. If you guess on each question, then the probability of answering all five questions correctly is approxima
The number of waves that pass a particular point in a unit of time is called the __________ of the waves. (a) rarefaction (b) compression (c) amplitude (d) freq