tebukura10000 tebukura10000
  • 03-03-2020
  • Computers and Technology
contestada

Round Robin Algorithm

Using the following table as your starting point for each algorithm RR with a time quantum of 5

Job
A
B
C
D
E

Arrival time:
0
0
0
0
0

Time burst:
15
2
14
10
1

Respuesta :

problemsolver2019
problemsolver2019 problemsolver2019
  • 03-03-2020

Answer:

Please check the attachment.

Explanation:

avg turnaround time = (38+7+42+33+18)/5= 27.6

avg waiting timee = (33+5+28+23+17)/5= 21.2

And its D, A C in Gantt chart at last and exit time are 33, 38 and 42 mentioned as last three in Gantt chart.

Ver imagen problemsolver2019
Answer Link

Otras preguntas

what can you infer about water use by Americans?
the vertices of square WXYZ have coordinates W(0,4), X(4,0), Y(0,-4) and Z(-4,0)
the area A of a rectangle parking lot is given by the equation A=16s^2+25. jacob knows the area of the parking lot and wants to find s. Solve A=16s^2+25 for s
Can anyone please help me with this.
In △ABC, M∈ AC and N∈ BC . Prove that MN ∥ AB , if: AM/CM =BN/CN
How to write 3,801,440 in expanded form
A gardener is planting two types of trees: Type A is 10 feet tall and grows at a rate of 10 inches per year. Type B is 6 feet tall and grows at a rate of 16
how far can a reindeer run in 1 hour explained
Answer questions 16 and 17for 15 points. Although I would appreciate it if you do 15, it is up to you. Thanks in advance.
Dimitri wants to measure the height of the palm tree. He lines himself up with the palm tree's shadow so that the tip of his shadow meets the tip of the palm t