​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

Which command best completes this conversation between two friends? Ray: Recibí un correo electrónico anónimo. Pedro: Puede ser peligroso. ¡No lo_______! abras
Homo sapiens have 23 pairs of chromosomes. this implies that ________.
78 million converted in scientific notation
maya plants 8 flower bulbs in the fall 2 purple 2 red and 4 pink find the probability that the first flower to bloom is pink
The complex of dna, rna, and associated proteins that gives shape to the chromosome is called
QUESTION 5 In “Mending Wall,” what does the imagery of “And set the wall between us once again” mean? a: engage in a conversation B: disagree about lif
What is the answer to 2/7 x 4 4/9
The equation of a line is 4x−3y=−24. What is the x-intercept of the line?
Why did the court decide that the second bank of the united states was immune from taxation?
Someone please help!!!!! I don't remember how to factor polynomials, can someone please explain step by step?