papasblueracer papasblueracer
  • 04-05-2016
  • Physics
contestada

The amount of work done on an object is found by multiplying what and what

Respuesta :

AL2006
AL2006 AL2006
  • 04-05-2016

           (the distance the object moves)
times
           (the force in the direction of motion that made it move) .
Answer Link

Otras preguntas

3/5x + 3 = 6 whats is x?​
y = 1/4x + 5, (−1, 6)
velocity and distance of free falling object dropped from rest
Rachel Carson: Everywhere was a shadow of death. The farmers spoke of much illness among their families. In the town the doctors had become more and more puzzle
Find the reciprocal of the sum of the reciprocals of 1/-5 and -1/6
Transportation officials tell us that 60% of drivers wear seat belts while driving. Find the probability that more than 562 drivers in a sample of 900 drivers w
What are the main functions of red blood cells ?
Now consider the case of Purple Panda Industries. Many of Purple Panda Industries’s customers have expanded to India. Consequently, Purple Panda Industries has
The equation for free fall at the surface of some planet (s in meters, t in seconds) is s=2.86t^2. How long does it take a rock falling from rest to reach a vel
An object is released from an aeroplane which is diving at an angle of 30° from the horizontal with a speed of 50m/s. If the plane is at a height of4000m from t