liluv4590 liluv4590
  • 02-04-2019
  • Mathematics
contestada

A potter works 4 days a week, makes 14 pots per day on average, and charges $24 a pot. Money per 4-day workweek?

Respuesta :

greubel80
greubel80 greubel80
  • 02-04-2019
Step by Step:

14 average pots x 4 days a week = average money made

14x4= 56

56 pots a 4-day week x 24$ a pot

56x24 = 1344$
Answer Link

Otras preguntas

Hi! I dont want to be billed and i have already cancelled my subscription, how can I get a refund for this?
A motorcycle is moving at 15 m/s when its brakes are applied, bringing the cycle to rest in 5.3 s. To the nearest meter, how far does the motorcycle travel whil
Tyler has a 28 percent marginal tax rate. His employer is willing to provide health insurance coverage for Tyler if he will agree to a salary reduction. The ins
the sentence he wont ever go to practice is an example of what error​
Suppose you were interested in the effect of breastfeeding versus formula feeding on the composition of gut flora in newborns. As part of your experiment, stool
Solve the inequality: –3(x + 2) > 4x + 5(x – 7)
What is the magnetic flux density (B-field) at a distance of 0.36 m from a long, straight wire carrying a current of 3.8 A in air? Give your answer in units of
Urinary tract infections are commonly caused by Staphylococcus saprophyticus and Escherichia coli, less commonly caused by Proteus mirabilis. You have a mixed c
helppppppppppppppppppppping
what are the missing coefficents for the following equation? __N2+__H2->__NH3 3,1,2 1,3,2 1,1,2 1,3,3